قائمة/جدول: ENA NS 47.1

قائمة/جدول ENA NS 47.1

العلامات

تاريخ الإدخال

في PGP منذ 2017

الوصف

Accounts in Judaeo-Arabic. Daily construction expenses for 3 Tammuz through 18 Tammuz. Many of the expenses are the same each day. They include the salary of a builder; a carpenter; meals for the workers; and more. Information from FGP.

ENA NS 47.1 1

1

النصوص المفرّغة

الترجمة

ENA NS 47.1 2

2
بيان أذونات الصورة
  • ENA NS 47.1: Images provided by the Jewish Theological Seminary Library (JTSL) CC-Zero / Public Domain